588245

Upgrade at the tunnel track.

Upgrade at the tunnel track.

The track crew have been working on the tunnel track at the hub to make life a bit more straight forward as the roads get busy over the holiday period. Photos show some of the work and the chief of works checking all protocols have been adhered to.

588245    588245

Posted: Thu 11 Dec 2014

© Bike Taupo Advocacy Group Incorporated 2018.

Proudly NZ Owned and Operated

Built by Expand IT Ltd