671617

Track Crew Update

Track Crew Update

Bruce and the Beagle Boys have given Walters Wiggles a tidy up. The trees are growing up and it should hold together better as time goes on.

671617              671617

This is on the Waihaha track which has a new alignment on the little section that was unrideable from the road to the swing bridge. The work has been funded by Trail Funds with help from BT and Volunteers.

671617

Posted: Sat 09 Apr 2016

© Bike Taupo Advocacy Group Incorporated 2018.

Proudly NZ Owned and Operated

Built by Expand IT Ltd