480834

Great Lake Trail Update

The Boys are in about 3.5 kms now still heading down Chinaman's Creek. The tracks is a very easy grade just dropping with the wetland that it run's beside. Lots of little bridges and board walk's over the Wetland's plus true to form we are going to have a tunnel in the track so the cows can go over top of the bikers, this is about two weeks away

If you want to have a noisy The start is about 6 kms past the Kinloch turn off at the bottom of the hill after Kawakawa Road

Check out the face book photos to see what its like

Track Crew

Posted: Tue 06 Dec 2011

© Bike Taupo Advocacy Group Incorporated 2018.

Proudly NZ Owned and Operated

Built by Expand IT Ltd