484664
May 2009
Track Crew News - May 2009
W2K
We have now put W2K to bed and any future work is now maintenance, as we are not on the track so much can people let us know, if any trees are down or any slips happened.
We have trouble getting around all the tracks nowadays (we are not to old - just too many tracks !) and it saves us a lot of time if we know what gear we need.
Wairakei
We are working on the new Outback track at the moment which is going to have two new bridges over Slalom and go up and around the big rock in the Young Pines. Plus Pete Manning has just about completed building the new single track along the top road, all of these changes have made a big difference to the Outback track as it now much more interesting to ride and its longer as well.
The bridge has been ripped out of the Drone as part of the new alignments so be carefully on a night ride.
The Contact boys are still working away on the new track going from Bumble Bee to Outwards Goods and further its getting closer by the day and when finished is going to be about 3 kms long so watch the web site for more details.
Down hillers are ripping down The Buddha plus have got together and open up Coles Killer again which is great to see.
The logging crew have just about finished in the old Switch Back area. The hill has been logged and they are clearing it for planting at the moment.
That’s the next track to be build as soon as the logging is finished.
The Track Crew
Track of the Month:
Tunnel Track - You fell guilty if you don’t do it !
Posted: Tue 19 May 2009