Last leg of the new Otaketake Loop.

The new Otaketake loop is getting close to completion! As at November 3rd, the gap between the two tracks is about 500 meters in a direct line which will mean around another 600 meters of track to be constructed.

Annotation 2019 11 05 075029

© Bike Taupo Advocacy Group Incorporated 2018.

Proudly NZ Owned and Operated

Built by Expand IT Ltd