Otaketake Loop Final Stages January 2020.

With the completion of the section from Kinloch to Kawakawa Rd Bike Taupo track crew are developing an off road track beside the road. There was no off road option through the cutting on Whangamata Rd so a concrete path has been laid on the road verge.

 map012020labeled

The new Otaketake track is the right hand section of track between the arrows.

 

.           79776474 2624242537630491 3645232507546238976 o

Concrete path through the cutting.

Whroad2c        Whroad1c

 New sections beside the road.