Projectshttps://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build2022-07-08T12:27:52+12:00Bike Taupo - Do not replyMYOBOtaketake Loop Final Stages January 2020.2020-01-07T09:30:26+13:002020-01-07T09:30:26+13:00https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1281-otaketake-loop-final-stages-january-2020Clyff Harrington<p>With the completion of the section from Kinloch to Kawakawa Rd Bike Taupo track crew are developing an off road track beside the road. There was no off road option through the cutting on Whangamata Rd so a concrete path has been laid on the road verge.</p>
<p> <img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/map012020labeled.png" alt="map012020labeled" /></p>
<p style="text-align: center;">The new Otaketake track is the right hand section of track between the arrows.</p>
<p> </p>
<p style="text-align: center;">. <img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/79776474_2624242537630491_3645232507546238976_o.jpg" alt="79776474 2624242537630491 3645232507546238976 o" /></p>
<p style="text-align: center;">Concrete path through the cutting.</p>
<p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/Whroad2c.png" alt="Whroad2c" /> <img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/Whroad1c.png" alt="Whroad1c" /></p>
<p style="text-align: center;"> New sections beside the road.</p><p>With the completion of the section from Kinloch to Kawakawa Rd Bike Taupo track crew are developing an off road track beside the road. There was no off road option through the cutting on Whangamata Rd so a concrete path has been laid on the road verge.</p>
<p> <img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/map012020labeled.png" alt="map012020labeled" /></p>
<p style="text-align: center;">The new Otaketake track is the right hand section of track between the arrows.</p>
<p> </p>
<p style="text-align: center;">. <img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/79776474_2624242537630491_3645232507546238976_o.jpg" alt="79776474 2624242537630491 3645232507546238976 o" /></p>
<p style="text-align: center;">Concrete path through the cutting.</p>
<p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/Whroad2c.png" alt="Whroad2c" /> <img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/Whroad1c.png" alt="Whroad1c" /></p>
<p style="text-align: center;"> New sections beside the road.</p>An on-road section of the GLT!2019-11-21T11:37:26+13:002019-11-21T11:37:26+13:00https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1277-an-on-road-section-of-the-gltClyff Harrington<p>As we get toward completing the Otaketake loop there is a neccesary on-road piece through the cutting on Whangamata Road, between Kawakawa Road and the Orakau shelter car park. Photo shows the site ready for concreting.</p>
<p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/Whangamacutting.png" alt="Whangamacutting" /></p><p>As we get toward completing the Otaketake loop there is a neccesary on-road piece through the cutting on Whangamata Road, between Kawakawa Road and the Orakau shelter car park. Photo shows the site ready for concreting.</p>
<p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/Whangamacutting.png" alt="Whangamacutting" /></p>Last leg of the new Otaketake Loop.2019-11-05T07:53:32+13:002019-11-05T07:53:32+13:00https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1276-last-leg-of-the-new-otaketake-loopClyff Harrington<p>The new Otaketake loop is getting close to completion! As at November 3rd, the gap between the two tracks is about 500 meters in a direct line which will mean around another 600 meters of track to be constructed.</p>
<p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/Annotation_2019-11-05_075029.jpg" alt="Annotation 2019 11 05 075029" /></p><p>The new Otaketake loop is getting close to completion! As at November 3rd, the gap between the two tracks is about 500 meters in a direct line which will mean around another 600 meters of track to be constructed.</p>
<p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/Annotation_2019-11-05_075029.jpg" alt="Annotation 2019 11 05 075029" /></p>Western end of Otaketake extension - 16/08/19 2019-08-16T08:43:09+12:002019-08-16T08:43:09+12:00https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1271-western-end-of-otaketake-extension-16-08-19Clyff Harrington<p>The digger has arrived at the western end of the new Otaketake extension. The crew will build the trail to join the completed section on the Kinloch end. Rock on lads!<img src="https://archive.biketaupo.org.nz/images/IMG_1802.JPG" alt="IMG 1802" /></p><p>The digger has arrived at the western end of the new Otaketake extension. The crew will build the trail to join the completed section on the Kinloch end. Rock on lads!<img src="https://archive.biketaupo.org.nz/images/IMG_1802.JPG" alt="IMG 1802" /></p>Extension crew shifting to Kawakawa Road end2019-08-05T17:02:26+12:002019-08-05T17:02:26+12:00https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1268-extension-crew-shifting-to-kawakawa-road-endClyff Harrington<p>July 5th - The Otaketake Extension has reached around halfway from the Kinloch end, so it is time to move the construction team to the Kawakawa Rd end. There are a few inconvenient rocks to be removed first so expect some action on the western end in a week or so. The picture will answer your technical questions.</p>
<p><img src="https://archive.biketaupo.org.nz/images/Annotation_2019-08-05_163913.png" alt="Annotation 2019 08 05 163913" /></p><p>July 5th - The Otaketake Extension has reached around halfway from the Kinloch end, so it is time to move the construction team to the Kawakawa Rd end. There are a few inconvenient rocks to be removed first so expect some action on the western end in a week or so. The picture will answer your technical questions.</p>
<p><img src="https://archive.biketaupo.org.nz/images/Annotation_2019-08-05_163913.png" alt="Annotation 2019 08 05 163913" /></p>Construction underway on western end of the new Otaktake Trail2019-08-02T09:17:48+12:002019-08-02T09:17:48+12:00https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1267-construction-underway-on-western-end-of-the-new-otaktake-trailClyff Harrington<p>Work has started at the Whangamata Road end of the Otaketake extension. As well as the track building there is planting taking place and some meaningful engagement with the locals. He/she is one of the original greenies.</p>
<p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/Orakau1.JPG" alt="Orakau1" /></p>
<p> </p>
<p><br /><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/Orakau2.JPG" alt="Orakau2" /></p>
<p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/Orakau3.jpeg" alt="Orakau3" /></p>
<p> </p><p>Work has started at the Whangamata Road end of the Otaketake extension. As well as the track building there is planting taking place and some meaningful engagement with the locals. He/she is one of the original greenies.</p>
<p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/Orakau1.JPG" alt="Orakau1" /></p>
<p> </p>
<p><br /><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/Orakau2.JPG" alt="Orakau2" /></p>
<p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/Orakau3.jpeg" alt="Orakau3" /></p>
<p> </p>Otaketake 22nd July2019-07-22T12:40:57+12:002019-07-22T12:40:57+12:00https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1265-otaketake-22nd-julyClyff Harrington<p>The Otaketake extension is now a total of 5.6 km from Kinloch Store and we have a new bridge to cross!</p>
<p><img src="https://archive.biketaupo.org.nz/images/IMG_1763.JPG" alt="IMG 1763" /></p>
<p><img src="https://archive.biketaupo.org.nz/images/Otake2207.png" alt="Otake2207" /></p><p>The Otaketake extension is now a total of 5.6 km from Kinloch Store and we have a new bridge to cross!</p>
<p><img src="https://archive.biketaupo.org.nz/images/IMG_1763.JPG" alt="IMG 1763" /></p>
<p><img src="https://archive.biketaupo.org.nz/images/Otake2207.png" alt="Otake2207" /></p>Almost 4km at Otaketake.2019-06-29T17:30:13+12:002019-06-29T17:30:13+12:00https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1263-almost-4km-at-otaketakeClyff Harrington<p>The new Otaketake trail now extends almost 4km from the intersection of the K2K track. Photos show the inspection crew at the trailhead Saturday 29th June. Lots of ticks on their clipboards!</p>
<p><img src="https://archive.biketaupo.org.nz/images/Strava2906.png" alt="Strava2906" /></p>
<p><img src="https://archive.biketaupo.org.nz/images/IMG_20190629_105056.jpg" alt="IMG 20190629 105056" /></p><p>The new Otaketake trail now extends almost 4km from the intersection of the K2K track. Photos show the inspection crew at the trailhead Saturday 29th June. Lots of ticks on their clipboards!</p>
<p><img src="https://archive.biketaupo.org.nz/images/Strava2906.png" alt="Strava2906" /></p>
<p><img src="https://archive.biketaupo.org.nz/images/IMG_20190629_105056.jpg" alt="IMG 20190629 105056" /></p>Otaketake June 19th2019-06-19T08:38:09+12:002019-06-19T08:38:09+12:00https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1260-otaketake-june-19thClyff Harrington<p>Latest shots from the Otaketake build from our intrepid early morning reporter. Apparently you have to be really really early to be up there first!</p>
<p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_4268.jpg" alt="IMG 4268" /></p>
<p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_4269.jpg" alt="IMG 4268" /></p>
<p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_4270.jpg" alt="IMG 4268" /></p>
<p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_4271.jpg" alt="IMG 4268" /></p>
<p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_4272.jpg" alt="IMG 4268" /></p>
<p> </p>
<p> </p><p>Latest shots from the Otaketake build from our intrepid early morning reporter. Apparently you have to be really really early to be up there first!</p>
<p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_4268.jpg" alt="IMG 4268" /></p>
<p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_4269.jpg" alt="IMG 4268" /></p>
<p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_4270.jpg" alt="IMG 4268" /></p>
<p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_4271.jpg" alt="IMG 4268" /></p>
<p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_4272.jpg" alt="IMG 4268" /></p>
<p> </p>
<p> </p>Otaketake June 6th 20192019-06-06T14:48:00+12:002019-06-06T14:48:00+12:00https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1259-otaketake-june-6th-2019Clyff Harrington<p> <img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/Capture060619.png" alt="Capture060619" /></p>
<p>The trail today extends 3.2 km from the <a href="mailto:K@K">K2K</a> track and is looking gorgeous!. </p>
<p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_20190606_111332.jpg" alt="IMG 20190606 111332" /></p>
<p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_1791.jpg" alt="IMG 1791" /></p><p> <img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/Capture060619.png" alt="Capture060619" /></p>
<p>The trail today extends 3.2 km from the <a href="mailto:K@K">K2K</a> track and is looking gorgeous!. </p>
<p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_20190606_111332.jpg" alt="IMG 20190606 111332" /></p>
<p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_1791.jpg" alt="IMG 1791" /></p>Otakatake Construction 24th May 20192019-05-27T10:26:57+12:002019-05-27T10:26:57+12:00https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1256-may-2019Clyff Harrington<p>Trail has passed the 2km mark and includes a switchback up to a rocky outcrop with great views to the south and east over Kinloch back to Tauhara.</p>
<p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/Capture1805.png" alt="Capture1805" /></p>
<p> <img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_20190508_121917.jpg" alt="IMG 20190508 121917" /></p>
<p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_20190508_121954.jpg" alt="IMG 20190508 121954" width="1224" height="564" /></p>
<p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_20190508_122259_1.jpg" alt="IMG 20190508 122259 1" /></p>
<p>Mac keeping Jack on task.</p>
<p>Trail has passed the 2km mark and includes a switchback up to a rocky outcrop with great views to the south and east over Kinloch back to Tauhara.</p>
<p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/Capture1805.png" alt="Capture1805" /></p>
<p> <img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_20190508_121917.jpg" alt="IMG 20190508 121917" /></p>
<p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_20190508_121954.jpg" alt="IMG 20190508 121954" width="1224" height="564" /></p>
<p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_20190508_122259_1.jpg" alt="IMG 20190508 122259 1" /></p>
<p>Mac keeping Jack on task.</p>
April 2019 - Construction Commences.2019-05-27T09:20:51+12:002019-05-27T09:20:51+12:00https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1255-april-construction-commencesClyff Harrington<p>The new Otaketake trail is underway turning right, north away from the lake about 2.5 km from Kinloch on the Kawakawa Bay trail. The trail will exit on to Kawakawa Road, a short distance from the Orakau carpark on Whangamata Rd. </p>
<p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/1804d.jpg" alt="1804d" /></p>
<p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/1804e.jpg" alt="1804e" /></p>
<p style="text-align: center;">Entry point </p>
<p>The new Otaketake trail is underway turning right, north away from the lake about 2.5 km from Kinloch on the Kawakawa Bay trail. The trail will exit on to Kawakawa Road, a short distance from the Orakau carpark on Whangamata Rd. </p>
<p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/1804d.jpg" alt="1804d" /></p>
<p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/1804e.jpg" alt="1804e" /></p>
<p style="text-align: center;">Entry point </p>