Projects https://archive.biketaupo.org.nz/index.php/projects 2022-07-08T12:24:16+12:00 Bike Taupo - Do not reply MYOB No major projects just now! 2020-11-11T17:33:13+13:00 2020-11-11T17:33:13+13:00 https://archive.biketaupo.org.nz/index.php/projects/1292-no-major-projects-just-now Clyff Harrington <p>Both the new car park at The Hub and the GLT Otaketake loop are now complete. Lots of rebuiding work going on in Craters after logging around the Connection.&nbsp;</p> <p>&nbsp;</p> <p><img src="https://archive.biketaupo.org.nz/images/85223892_3018389784882429_2537286600297276742_o.jpg" alt="85223892 3018389784882429 2537286600297276742 o" /></p> <p><img src="https://archive.biketaupo.org.nz/images/107736145_3111795335541873_3372695528874684939_n.jpg" alt="107736145 3111795335541873 3372695528874684939 n" /></p> <p>We have a new access way at Whakaipo - the old e-bikers were having trouble with the stile!</p> <p><img src="https://archive.biketaupo.org.nz/images/W2kyard.jpg" alt="W2kyard" /></p> <p>Both the new car park at The Hub and the GLT Otaketake loop are now complete. Lots of rebuiding work going on in Craters after logging around the Connection.&nbsp;</p> <p>&nbsp;</p> <p><img src="https://archive.biketaupo.org.nz/images/85223892_3018389784882429_2537286600297276742_o.jpg" alt="85223892 3018389784882429 2537286600297276742 o" /></p> <p><img src="https://archive.biketaupo.org.nz/images/107736145_3111795335541873_3372695528874684939_n.jpg" alt="107736145 3111795335541873 3372695528874684939 n" /></p> <p>We have a new access way at Whakaipo - the old e-bikers were having trouble with the stile!</p> <p><img src="https://archive.biketaupo.org.nz/images/W2kyard.jpg" alt="W2kyard" /></p> Otaketake Loop Final Stages January 2020. 2020-01-07T09:30:26+13:00 2020-01-07T09:30:26+13:00 https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1281-otaketake-loop-final-stages-january-2020 Clyff Harrington <p>With the completion of the section from Kinloch to Kawakawa Rd Bike Taupo track crew are developing an off road track beside the road. There was no off road option through the cutting on Whangamata Rd so a concrete path has been laid on the road verge.</p> <p>&nbsp;<img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/map012020labeled.png" alt="map012020labeled" /></p> <p style="text-align: center;">The new Otaketake track is the right hand section of track between the arrows.</p> <p>&nbsp;</p> <p style="text-align: center;">.&nbsp;&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;<img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/79776474_2624242537630491_3645232507546238976_o.jpg" alt="79776474 2624242537630491 3645232507546238976 o" /></p> <p style="text-align: center;">Concrete path through the cutting.</p> <p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/Whroad2c.png" alt="Whroad2c" />&nbsp; &nbsp; &nbsp; &nbsp;&nbsp;<img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/Whroad1c.png" alt="Whroad1c" /></p> <p style="text-align: center;">&nbsp;New sections beside the road.</p> <p>With the completion of the section from Kinloch to Kawakawa Rd Bike Taupo track crew are developing an off road track beside the road. There was no off road option through the cutting on Whangamata Rd so a concrete path has been laid on the road verge.</p> <p>&nbsp;<img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/map012020labeled.png" alt="map012020labeled" /></p> <p style="text-align: center;">The new Otaketake track is the right hand section of track between the arrows.</p> <p>&nbsp;</p> <p style="text-align: center;">.&nbsp;&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;<img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/79776474_2624242537630491_3645232507546238976_o.jpg" alt="79776474 2624242537630491 3645232507546238976 o" /></p> <p style="text-align: center;">Concrete path through the cutting.</p> <p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/Whroad2c.png" alt="Whroad2c" />&nbsp; &nbsp; &nbsp; &nbsp;&nbsp;<img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/Whroad1c.png" alt="Whroad1c" /></p> <p style="text-align: center;">&nbsp;New sections beside the road.</p> An on-road section of the GLT! 2019-11-21T11:37:26+13:00 2019-11-21T11:37:26+13:00 https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1277-an-on-road-section-of-the-glt Clyff Harrington <p>As we get toward completing the Otaketake loop there is a neccesary on-road piece through the cutting on Whangamata Road, between Kawakawa Road and the Orakau shelter car park. Photo shows the site ready for concreting.</p> <p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/Whangamacutting.png" alt="Whangamacutting" /></p> <p>As we get toward completing the Otaketake loop there is a neccesary on-road piece through the cutting on Whangamata Road, between Kawakawa Road and the Orakau shelter car park. Photo shows the site ready for concreting.</p> <p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/Whangamacutting.png" alt="Whangamacutting" /></p> Last leg of the new Otaketake Loop. 2019-11-05T07:53:32+13:00 2019-11-05T07:53:32+13:00 https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1276-last-leg-of-the-new-otaketake-loop Clyff Harrington <p>The new Otaketake loop is getting close to completion! As at November 3rd, the gap between the two tracks is about 500 meters in a direct line which will mean around another 600 meters of track to be constructed.</p> <p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/Annotation_2019-11-05_075029.jpg" alt="Annotation 2019 11 05 075029" /></p> <p>The new Otaketake loop is getting close to completion! As at November 3rd, the gap between the two tracks is about 500 meters in a direct line which will mean around another 600 meters of track to be constructed.</p> <p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/Annotation_2019-11-05_075029.jpg" alt="Annotation 2019 11 05 075029" /></p> Western end of Otaketake extension - 16/08/19 2019-08-16T08:43:09+12:00 2019-08-16T08:43:09+12:00 https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1271-western-end-of-otaketake-extension-16-08-19 Clyff Harrington <p>The digger has arrived at the western end of the new Otaketake extension. The crew will build the trail to join the completed section on the Kinloch end. Rock on lads!<img src="https://archive.biketaupo.org.nz/images/IMG_1802.JPG" alt="IMG 1802" /></p> <p>The digger has arrived at the western end of the new Otaketake extension. The crew will build the trail to join the completed section on the Kinloch end. Rock on lads!<img src="https://archive.biketaupo.org.nz/images/IMG_1802.JPG" alt="IMG 1802" /></p> Extension crew shifting to Kawakawa Road end 2019-08-05T17:02:26+12:00 2019-08-05T17:02:26+12:00 https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1268-extension-crew-shifting-to-kawakawa-road-end Clyff Harrington <p>July 5th - The Otaketake Extension has reached around halfway from the Kinloch end, so it is time to move the construction team to the Kawakawa Rd end. There are a few inconvenient rocks to be removed first so expect some action on the western end in a week or so. The picture will answer your technical questions.</p> <p><img src="https://archive.biketaupo.org.nz/images/Annotation_2019-08-05_163913.png" alt="Annotation 2019 08 05 163913" /></p> <p>July 5th - The Otaketake Extension has reached around halfway from the Kinloch end, so it is time to move the construction team to the Kawakawa Rd end. There are a few inconvenient rocks to be removed first so expect some action on the western end in a week or so. The picture will answer your technical questions.</p> <p><img src="https://archive.biketaupo.org.nz/images/Annotation_2019-08-05_163913.png" alt="Annotation 2019 08 05 163913" /></p> Construction underway on western end of the new Otaktake Trail 2019-08-02T09:17:48+12:00 2019-08-02T09:17:48+12:00 https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1267-construction-underway-on-western-end-of-the-new-otaktake-trail Clyff Harrington <p>Work has started&nbsp;at the Whangamata Road end of the Otaketake extension. As well as the track building there is planting taking place and some meaningful engagement with the locals. He/she is one of the original greenies.</p> <p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/Orakau1.JPG" alt="Orakau1" /></p> <p>&nbsp;</p> <p><br /><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/Orakau2.JPG" alt="Orakau2" /></p> <p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/Orakau3.jpeg" alt="Orakau3" /></p> <p>&nbsp;</p> <p>Work has started&nbsp;at the Whangamata Road end of the Otaketake extension. As well as the track building there is planting taking place and some meaningful engagement with the locals. He/she is one of the original greenies.</p> <p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/Orakau1.JPG" alt="Orakau1" /></p> <p>&nbsp;</p> <p><br /><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/Orakau2.JPG" alt="Orakau2" /></p> <p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/Orakau3.jpeg" alt="Orakau3" /></p> <p>&nbsp;</p> Otaketake 22nd July 2019-07-22T12:40:57+12:00 2019-07-22T12:40:57+12:00 https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1265-otaketake-22nd-july Clyff Harrington <p>The Otaketake extension is now a total of 5.6 km from Kinloch Store&nbsp;and we have a new bridge to cross!</p> <p><img src="https://archive.biketaupo.org.nz/images/IMG_1763.JPG" alt="IMG 1763" /></p> <p><img src="https://archive.biketaupo.org.nz/images/Otake2207.png" alt="Otake2207" /></p> <p>The Otaketake extension is now a total of 5.6 km from Kinloch Store&nbsp;and we have a new bridge to cross!</p> <p><img src="https://archive.biketaupo.org.nz/images/IMG_1763.JPG" alt="IMG 1763" /></p> <p><img src="https://archive.biketaupo.org.nz/images/Otake2207.png" alt="Otake2207" /></p> Almost 4km at Otaketake. 2019-06-29T17:30:13+12:00 2019-06-29T17:30:13+12:00 https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1263-almost-4km-at-otaketake Clyff Harrington <p>The new Otaketake trail now extends almost 4km from the intersection of the K2K track. Photos show the inspection crew at the trailhead Saturday 29th June. Lots of ticks on their clipboards!</p> <p><img src="https://archive.biketaupo.org.nz/images/Strava2906.png" alt="Strava2906" /></p> <p><img src="https://archive.biketaupo.org.nz/images/IMG_20190629_105056.jpg" alt="IMG 20190629 105056" /></p> <p>The new Otaketake trail now extends almost 4km from the intersection of the K2K track. Photos show the inspection crew at the trailhead Saturday 29th June. Lots of ticks on their clipboards!</p> <p><img src="https://archive.biketaupo.org.nz/images/Strava2906.png" alt="Strava2906" /></p> <p><img src="https://archive.biketaupo.org.nz/images/IMG_20190629_105056.jpg" alt="IMG 20190629 105056" /></p> Otaketake June 19th 2019-06-19T08:38:09+12:00 2019-06-19T08:38:09+12:00 https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1260-otaketake-june-19th Clyff Harrington <p>Latest shots from the Otaketake build from our intrepid early morning reporter. Apparently you have to be really really early to be up there first!</p> <p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_4268.jpg" alt="IMG 4268" /></p> <p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_4269.jpg" alt="IMG 4268" /></p> <p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_4270.jpg" alt="IMG 4268" /></p> <p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_4271.jpg" alt="IMG 4268" /></p> <p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_4272.jpg" alt="IMG 4268" /></p> <p>&nbsp;</p> <p>&nbsp;</p> <p>Latest shots from the Otaketake build from our intrepid early morning reporter. Apparently you have to be really really early to be up there first!</p> <p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_4268.jpg" alt="IMG 4268" /></p> <p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_4269.jpg" alt="IMG 4268" /></p> <p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_4270.jpg" alt="IMG 4268" /></p> <p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_4271.jpg" alt="IMG 4268" /></p> <p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_4272.jpg" alt="IMG 4268" /></p> <p>&nbsp;</p> <p>&nbsp;</p> Otaketake June 6th 2019 2019-06-06T14:48:00+12:00 2019-06-06T14:48:00+12:00 https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1259-otaketake-june-6th-2019 Clyff Harrington <p>&nbsp;<img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/Capture060619.png" alt="Capture060619" /></p> <p>The trail today extends 3.2 km from the <a href="mailto:K@K">K2K</a>&nbsp;track and is looking gorgeous!.&nbsp;</p> <p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_20190606_111332.jpg" alt="IMG 20190606 111332" /></p> <p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_1791.jpg" alt="IMG 1791" /></p> <p>&nbsp;<img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/Capture060619.png" alt="Capture060619" /></p> <p>The trail today extends 3.2 km from the <a href="mailto:K@K">K2K</a>&nbsp;track and is looking gorgeous!.&nbsp;</p> <p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_20190606_111332.jpg" alt="IMG 20190606 111332" /></p> <p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_1791.jpg" alt="IMG 1791" /></p> Otakatake Construction 24th May 2019 2019-05-27T10:26:57+12:00 2019-05-27T10:26:57+12:00 https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1256-may-2019 Clyff Harrington <p>Trail has passed the 2km mark and includes a switchback up to a rocky outcrop with great views to the south and east over Kinloch back to Tauhara.</p> <p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/Capture1805.png" alt="Capture1805" /></p> <p>&nbsp;<img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_20190508_121917.jpg" alt="IMG 20190508 121917" /></p> <p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_20190508_121954.jpg" alt="IMG 20190508 121954" width="1224" height="564" /></p> <p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_20190508_122259_1.jpg" alt="IMG 20190508 122259 1" /></p> <p>Mac keeping Jack on task.</p> <p>Trail has passed the 2km mark and includes a switchback up to a rocky outcrop with great views to the south and east over Kinloch back to Tauhara.</p> <p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/Capture1805.png" alt="Capture1805" /></p> <p>&nbsp;<img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_20190508_121917.jpg" alt="IMG 20190508 121917" /></p> <p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_20190508_121954.jpg" alt="IMG 20190508 121954" width="1224" height="564" /></p> <p><img src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/IMG_20190508_122259_1.jpg" alt="IMG 20190508 122259 1" /></p> <p>Mac keeping Jack on task.</p> April 2019 - Construction Commences. 2019-05-27T09:20:51+12:00 2019-05-27T09:20:51+12:00 https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1255-april-construction-commences Clyff Harrington <p>The new Otaketake trail is underway turning right, north away from the lake about 2.5 km from Kinloch on the Kawakawa Bay trail. The trail will exit on to Kawakawa Road, a short distance from the Orakau carpark on Whangamata Rd.&nbsp;</p> <p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/1804d.jpg" alt="1804d" /></p> <p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/1804e.jpg" alt="1804e" /></p> <p style="text-align: center;">Entry point&nbsp;</p> <p>The new Otaketake trail is underway turning right, north away from the lake about 2.5 km from Kinloch on the Kawakawa Bay trail. The trail will exit on to Kawakawa Road, a short distance from the Orakau carpark on Whangamata Rd.&nbsp;</p> <p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/1804d.jpg" alt="1804d" /></p> <p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://archive.biketaupo.org.nz/images/OtaketakeConstruction/1804e.jpg" alt="1804e" /></p> <p style="text-align: center;">Entry point&nbsp;</p> Sealing the new Hub Carpark 2019-10-10T09:08:05+13:00 2019-10-10T09:08:05+13:00 https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1275-sealing-the-new-hub-carpark Clyff Harrington <p>The new car park at The Hub is taking shape with the hotmix going in today (9/10/19)</p> <p><img src="https://archive.biketaupo.org.nz/images/Hub091019.JPG" alt="Hub091019" /></p> <p><img src="https://archive.biketaupo.org.nz/images/Hub091019a.JPG" alt="Hub091019a" /></p> <p>The new car park at The Hub is taking shape with the hotmix going in today (9/10/19)</p> <p><img src="https://archive.biketaupo.org.nz/images/Hub091019.JPG" alt="Hub091019" /></p> <p><img src="https://archive.biketaupo.org.nz/images/Hub091019a.JPG" alt="Hub091019a" /></p> Bike Taupo Car Park Update 2019-08-26T20:40:21+12:00 2019-08-26T20:40:21+12:00 https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1272-bike-taupo-car-park-update Mike Birch <p style="text-align: center;"><iframe src="https://www.youtube.com/embed/EodoGovGFfg?rel=1" width="560" height="315" frameborder="0" allowfullscreen="allowfullscreen"></iframe></p> <p style="text-align: center;"><iframe src="https://www.youtube.com/embed/EodoGovGFfg?rel=1" width="560" height="315" frameborder="0" allowfullscreen="allowfullscreen"></iframe></p> Kerbing at the new car park - looking sharp! 2019-08-13T15:33:04+12:00 2019-08-13T15:33:04+12:00 https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1270-kerbing-at-the-new-car-park-looking-sharp Clyff Harrington <p><img src="https://archive.biketaupo.org.nz/images/IMG_20190814_154513.jpg" alt="IMG 20190814 154513" /></p> <p>Kerbing going down on 13th August.</p> <p><img src="https://archive.biketaupo.org.nz/images/Kerb1.PNG" alt="Kerb1" width="742" height="280" /></p> <p><img src="https://archive.biketaupo.org.nz/images/IMG_1796c.JPG" alt="IMG 1796c" /></p> <p>&nbsp;</p> <p>&nbsp;</p> <p>&nbsp;</p> <p><img src="https://archive.biketaupo.org.nz/images/IMG_20190814_154513.jpg" alt="IMG 20190814 154513" /></p> <p>Kerbing going down on 13th August.</p> <p><img src="https://archive.biketaupo.org.nz/images/Kerb1.PNG" alt="Kerb1" width="742" height="280" /></p> <p><img src="https://archive.biketaupo.org.nz/images/IMG_1796c.JPG" alt="IMG 1796c" /></p> <p>&nbsp;</p> <p>&nbsp;</p> <p>&nbsp;</p> Kerbing going down on the new car park in the next few days. 2019-08-06T12:03:17+12:00 2019-08-06T12:03:17+12:00 https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1269-kerbing-going-down-on-the-new-car-park-in-the-next-few-days Clyff Harrington <p>July 6th - The car park is all pegged out for the kerbing to go in over the next few days, weather permitting.</p> <p>.<img src="https://archive.biketaupo.org.nz/images/IMG_1784.JPG" alt="IMG 1784" /></p> <p><img src="https://archive.biketaupo.org.nz/images/IMG_1785.JPG" alt="IMG 1785" /></p> <p><img src="https://archive.biketaupo.org.nz/images/IMG_1786.JPG" alt="IMG 1786" /></p> <p>&nbsp;</p> <p>&nbsp;</p> <p>July 6th - The car park is all pegged out for the kerbing to go in over the next few days, weather permitting.</p> <p>.<img src="https://archive.biketaupo.org.nz/images/IMG_1784.JPG" alt="IMG 1784" /></p> <p><img src="https://archive.biketaupo.org.nz/images/IMG_1785.JPG" alt="IMG 1785" /></p> <p><img src="https://archive.biketaupo.org.nz/images/IMG_1786.JPG" alt="IMG 1786" /></p> <p>&nbsp;</p> <p>&nbsp;</p> Hub Carpark Progress 2019-07-30T15:35:44+12:00 2019-07-30T15:35:44+12:00 https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1266-hub-carpark-progress Clyff Harrington <p>Seays continue shifting dirt around the new park area. They are working to the pegs indicating the final levels in the main area and&nbsp;the second area along the roadside opposite FourB.</p> <p><img src="https://archive.biketaupo.org.nz/images/Comp1IMG_20190730_122744.jpg" alt="Comp1IMG 20190730 122744" /></p> <p><img src="https://archive.biketaupo.org.nz/images/Comp2IMG_20190730_122816.jpg" alt="Comp2IMG 20190730 122816" /></p> <p>Seays continue shifting dirt around the new park area. They are working to the pegs indicating the final levels in the main area and&nbsp;the second area along the roadside opposite FourB.</p> <p><img src="https://archive.biketaupo.org.nz/images/Comp1IMG_20190730_122744.jpg" alt="Comp1IMG 20190730 122744" /></p> <p><img src="https://archive.biketaupo.org.nz/images/Comp2IMG_20190730_122816.jpg" alt="Comp2IMG 20190730 122816" /></p> Sorting the levels at the Hub Carpark 12/07/19 2019-07-12T15:50:31+12:00 2019-07-12T15:50:31+12:00 https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1264-sorting-the-levels-at-the-hub-carpark-12-07-19 Clyff Harrington <p>Seay's have been busy shifting lots of pumice at The Hub to sort the levels at the new car park. Taking shape nicely.</p> <p>Side note: The Otaketake extension is now at 4.2 km.</p> <p><img src="https://archive.biketaupo.org.nz/images/Captur1.PNG" alt="Captur1" /></p> <p>&nbsp;<img src="https://archive.biketaupo.org.nz/images/Capture.PNG" alt="Capture" /></p> <p>Seay's have been busy shifting lots of pumice at The Hub to sort the levels at the new car park. Taking shape nicely.</p> <p>Side note: The Otaketake extension is now at 4.2 km.</p> <p><img src="https://archive.biketaupo.org.nz/images/Captur1.PNG" alt="Captur1" /></p> <p>&nbsp;<img src="https://archive.biketaupo.org.nz/images/Capture.PNG" alt="Capture" /></p> Update from the Hub - Spoiler alert - Contains commercial content! 2019-06-28T17:43:19+12:00 2019-06-28T17:43:19+12:00 https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1262-update-from-the-hub-spoiler-alert-contains-commercial-content Clyff Harrington <p>Latest video from Jonny (FourB) at the hub.</p> <p><iframe src="https://www.youtube.com/embed/lsHax0bJI1E?rel=1" width="560" height="315" frameborder="0" allowfullscreen="allowfullscreen"></iframe></p> <p>Latest video from Jonny (FourB) at the hub.</p> <p><iframe src="https://www.youtube.com/embed/lsHax0bJI1E?rel=1" width="560" height="315" frameborder="0" allowfullscreen="allowfullscreen"></iframe></p> Hub Car Park June 19th. 2019-06-19T08:50:32+12:00 2019-06-19T08:50:32+12:00 https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1261-hub-car-park-june-19th Clyff Harrington <p>You may have wondered about the blue pipes going in. They are an upgrade of the exisitng water pipe to include a fire hydrant. This work is&nbsp;almost complete, so it's</p> <h2 style="text-align: center;"><strong>time for a bigger digger!</strong></h2> <p><img src="https://archive.biketaupo.org.nz/images/Hubcarpark/IMG_1698.jpg" alt="IMG 1698" /></p> <p>You may have wondered about the blue pipes going in. They are an upgrade of the exisitng water pipe to include a fire hydrant. This work is&nbsp;almost complete, so it's</p> <h2 style="text-align: center;"><strong>time for a bigger digger!</strong></h2> <p><img src="https://archive.biketaupo.org.nz/images/Hubcarpark/IMG_1698.jpg" alt="IMG 1698" /></p> Hub Car Park Development - Started May 2019 2019-05-30T09:56:00+12:00 2019-05-30T09:56:00+12:00 https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1257-hub-car-park-development-started-may-2019 Clyff Harrington <p>In 2018 Bike Taupō were successful in getting half a million dollars from a&nbsp;TIF (Tourism Infrastructure Fund)&nbsp;one of the few non-government groups to do so. This funding was for the development of a new mountain biking hub (the Hub) on the vacant land opposite Kefi at the Hub and FourB. Bike Taupō has a&nbsp;licence from TDC to occupy this area until 2028.&nbsp;</p> <p><strong>This is the concept plan:</strong></p> <p><img src="https://archive.biketaupo.org.nz/images/Hubcarpark/Concept.png" alt="Concept" />&nbsp;</p> <p>A large part of this funding will go towards creating a carpark for trail users. There will be 51 parks in main area and a further 19 along Huka Falls Road. These parks will be longer than normal to allow loading and unloading of bikes and pedestrian access.&nbsp;There will also be a shelter, a bike wash facility and toilets. We will ensure that all trees currently on site&nbsp;are preserved. Roading and pedestrian signage will&nbsp;be modified to&nbsp;ensure everyone is safe with &nbsp;the increased activity.</p> <p>The carpark will link to Craters MTB Park via the tunnel under Wairakei Drive, the Cafe and Bike Hire, the Huka Trails and a soon to be constructed, shared path along Wairakei Drive to Taupō town.&nbsp;</p> <p>&nbsp;<iframe style="display: block; margin-left: auto; margin-right: auto;" src="https://www.youtube.com/embed/ivMSCl6xCbo?rel=1" width="560" height="315" frameborder="0" allowfullscreen="allowfullscreen"></iframe></p> <p>&nbsp;</p> <p>&nbsp;</p> <p>&nbsp;</p> <p>In 2018 Bike Taupō were successful in getting half a million dollars from a&nbsp;TIF (Tourism Infrastructure Fund)&nbsp;one of the few non-government groups to do so. This funding was for the development of a new mountain biking hub (the Hub) on the vacant land opposite Kefi at the Hub and FourB. Bike Taupō has a&nbsp;licence from TDC to occupy this area until 2028.&nbsp;</p> <p><strong>This is the concept plan:</strong></p> <p><img src="https://archive.biketaupo.org.nz/images/Hubcarpark/Concept.png" alt="Concept" />&nbsp;</p> <p>A large part of this funding will go towards creating a carpark for trail users. There will be 51 parks in main area and a further 19 along Huka Falls Road. These parks will be longer than normal to allow loading and unloading of bikes and pedestrian access.&nbsp;There will also be a shelter, a bike wash facility and toilets. We will ensure that all trees currently on site&nbsp;are preserved. Roading and pedestrian signage will&nbsp;be modified to&nbsp;ensure everyone is safe with &nbsp;the increased activity.</p> <p>The carpark will link to Craters MTB Park via the tunnel under Wairakei Drive, the Cafe and Bike Hire, the Huka Trails and a soon to be constructed, shared path along Wairakei Drive to Taupō town.&nbsp;</p> <p>&nbsp;<iframe style="display: block; margin-left: auto; margin-right: auto;" src="https://www.youtube.com/embed/ivMSCl6xCbo?rel=1" width="560" height="315" frameborder="0" allowfullscreen="allowfullscreen"></iframe></p> <p>&nbsp;</p> <p>&nbsp;</p> <p>&nbsp;</p> Karapiti Tunnel Pipes On-site 2019-06-05T14:01:20+12:00 2019-06-05T14:01:20+12:00 https://archive.biketaupo.org.nz/index.php/projects/23-karapiti-tunnel/1258-karapiti-tunnel-pipes-on-site Clyff Harrington <p>Everybody is familiar with the tricky road crossing from the old main car park to Hammer and Tank Stand across Karapiti Road. The good news is we are getting close to constructing a dual underpass to improve access to the northern side of the park. The pipes below have been purchased with generous funding from Lion Foundation, Grassroots, and Craters of the Moon Trust. The pipes are now on site&nbsp;and we are in the process of fundraising to purchase a hole to place the pipes in.</p> <p>&nbsp;<img src="https://archive.biketaupo.org.nz/images/KarapitiTunnel/KT1.jpg" alt="KT1" /></p> <p><img src="https://archive.biketaupo.org.nz/images/KarapitiTunnel/KT2.jpg" alt="KT2" /></p> <p>&nbsp;</p> <p>Everybody is familiar with the tricky road crossing from the old main car park to Hammer and Tank Stand across Karapiti Road. The good news is we are getting close to constructing a dual underpass to improve access to the northern side of the park. The pipes below have been purchased with generous funding from Lion Foundation, Grassroots, and Craters of the Moon Trust. The pipes are now on site&nbsp;and we are in the process of fundraising to purchase a hole to place the pipes in.</p> <p>&nbsp;<img src="https://archive.biketaupo.org.nz/images/KarapitiTunnel/KT1.jpg" alt="KT1" /></p> <p><img src="https://archive.biketaupo.org.nz/images/KarapitiTunnel/KT2.jpg" alt="KT2" /></p> <p>&nbsp;</p>