Projects https://archive.biketaupo.org.nz/index.php/projects Fri, 08 Jul 2022 12:24:15 +1200 MYOB en-gb No major projects just now! https://archive.biketaupo.org.nz/index.php/projects/1292-no-major-projects-just-now https://archive.biketaupo.org.nz/index.php/projects/1292-no-major-projects-just-now Both the new car park at The Hub and the GLT Otaketake loop are now complete. Lots of rebuiding work going on in Craters after logging around the Connection. 

 

85223892 3018389784882429 2537286600297276742 o

107736145 3111795335541873 3372695528874684939 n

We have a new access way at Whakaipo - the old e-bikers were having trouble with the stile!

W2kyard

]]>
Projects Wed, 11 Nov 2020 17:33:13 +1300
Otaketake Loop Final Stages January 2020. https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1281-otaketake-loop-final-stages-january-2020 https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1281-otaketake-loop-final-stages-january-2020 With the completion of the section from Kinloch to Kawakawa Rd Bike Taupo track crew are developing an off road track beside the road. There was no off road option through the cutting on Whangamata Rd so a concrete path has been laid on the road verge.

 map012020labeled

The new Otaketake track is the right hand section of track between the arrows.

 

.           79776474 2624242537630491 3645232507546238976 o

Concrete path through the cutting.

Whroad2c        Whroad1c

 New sections beside the road.

]]>
Otaketake Trail Build Tue, 07 Jan 2020 09:30:26 +1300
An on-road section of the GLT! https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1277-an-on-road-section-of-the-glt https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1277-an-on-road-section-of-the-glt As we get toward completing the Otaketake loop there is a neccesary on-road piece through the cutting on Whangamata Road, between Kawakawa Road and the Orakau shelter car park. Photo shows the site ready for concreting.

Whangamacutting

]]>
Otaketake Trail Build Thu, 21 Nov 2019 11:37:26 +1300
Last leg of the new Otaketake Loop. https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1276-last-leg-of-the-new-otaketake-loop https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1276-last-leg-of-the-new-otaketake-loop The new Otaketake loop is getting close to completion! As at November 3rd, the gap between the two tracks is about 500 meters in a direct line which will mean around another 600 meters of track to be constructed.

Annotation 2019 11 05 075029

]]>
Otaketake Trail Build Tue, 05 Nov 2019 07:53:32 +1300
Western end of Otaketake extension - 16/08/19 https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1271-western-end-of-otaketake-extension-16-08-19 https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1271-western-end-of-otaketake-extension-16-08-19 The digger has arrived at the western end of the new Otaketake extension. The crew will build the trail to join the completed section on the Kinloch end. Rock on lads!IMG 1802

]]>
Otaketake Trail Build Fri, 16 Aug 2019 08:43:09 +1200
Extension crew shifting to Kawakawa Road end https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1268-extension-crew-shifting-to-kawakawa-road-end https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1268-extension-crew-shifting-to-kawakawa-road-end July 5th - The Otaketake Extension has reached around halfway from the Kinloch end, so it is time to move the construction team to the Kawakawa Rd end. There are a few inconvenient rocks to be removed first so expect some action on the western end in a week or so. The picture will answer your technical questions.

Annotation 2019 08 05 163913

]]>
Otaketake Trail Build Mon, 05 Aug 2019 17:02:26 +1200
Construction underway on western end of the new Otaktake Trail https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1267-construction-underway-on-western-end-of-the-new-otaktake-trail https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1267-construction-underway-on-western-end-of-the-new-otaktake-trail Work has started at the Whangamata Road end of the Otaketake extension. As well as the track building there is planting taking place and some meaningful engagement with the locals. He/she is one of the original greenies.

Orakau1

 


Orakau2

Orakau3

 

]]>
Otaketake Trail Build Fri, 02 Aug 2019 09:17:48 +1200
Otaketake 22nd July https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1265-otaketake-22nd-july https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1265-otaketake-22nd-july The Otaketake extension is now a total of 5.6 km from Kinloch Store and we have a new bridge to cross!

IMG 1763

Otake2207

]]>
Otaketake Trail Build Mon, 22 Jul 2019 12:40:57 +1200
Almost 4km at Otaketake. https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1263-almost-4km-at-otaketake https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1263-almost-4km-at-otaketake The new Otaketake trail now extends almost 4km from the intersection of the K2K track. Photos show the inspection crew at the trailhead Saturday 29th June. Lots of ticks on their clipboards!

Strava2906

IMG 20190629 105056

]]>
Otaketake Trail Build Sat, 29 Jun 2019 17:30:13 +1200
Otaketake June 19th https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1260-otaketake-june-19th https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1260-otaketake-june-19th Latest shots from the Otaketake build from our intrepid early morning reporter. Apparently you have to be really really early to be up there first!

IMG 4268

IMG 4268

IMG 4268

IMG 4268

IMG 4268

 

 

]]>
Otaketake Trail Build Wed, 19 Jun 2019 08:38:09 +1200
Otaketake June 6th 2019 https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1259-otaketake-june-6th-2019 https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1259-otaketake-june-6th-2019  Capture060619

The trail today extends 3.2 km from the K2K track and is looking gorgeous!. 

IMG 20190606 111332

IMG 1791

]]>
Otaketake Trail Build Thu, 06 Jun 2019 14:48:00 +1200
Otakatake Construction 24th May 2019 https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1256-may-2019 https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1256-may-2019 Trail has passed the 2km mark and includes a switchback up to a rocky outcrop with great views to the south and east over Kinloch back to Tauhara.

Capture1805

 IMG 20190508 121917

IMG 20190508 121954

IMG 20190508 122259 1

Mac keeping Jack on task.

]]>
Otaketake Trail Build Mon, 27 May 2019 10:26:57 +1200
April 2019 - Construction Commences. https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1255-april-construction-commences https://archive.biketaupo.org.nz/index.php/projects/20-otaketake-trail-build/1255-april-construction-commences The new Otaketake trail is underway turning right, north away from the lake about 2.5 km from Kinloch on the Kawakawa Bay trail. The trail will exit on to Kawakawa Road, a short distance from the Orakau carpark on Whangamata Rd. 

1804d

1804e

Entry point 

]]>
Otaketake Trail Build Mon, 27 May 2019 09:20:51 +1200
Sealing the new Hub Carpark https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1275-sealing-the-new-hub-carpark https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1275-sealing-the-new-hub-carpark The new car park at The Hub is taking shape with the hotmix going in today (9/10/19)

Hub091019

Hub091019a

]]>
Hub Car Park Development Thu, 10 Oct 2019 09:08:05 +1300
Bike Taupo Car Park Update https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1272-bike-taupo-car-park-update https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1272-bike-taupo-car-park-update

]]>
Hub Car Park Development Mon, 26 Aug 2019 20:40:21 +1200
Kerbing at the new car park - looking sharp! https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1270-kerbing-at-the-new-car-park-looking-sharp https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1270-kerbing-at-the-new-car-park-looking-sharp IMG 20190814 154513

Kerbing going down on 13th August.

Kerb1

IMG 1796c

 

 

 

]]>
Hub Car Park Development Tue, 13 Aug 2019 15:33:04 +1200
Kerbing going down on the new car park in the next few days. https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1269-kerbing-going-down-on-the-new-car-park-in-the-next-few-days https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1269-kerbing-going-down-on-the-new-car-park-in-the-next-few-days July 6th - The car park is all pegged out for the kerbing to go in over the next few days, weather permitting.

.IMG 1784

IMG 1785

IMG 1786

 

 

]]>
Hub Car Park Development Tue, 06 Aug 2019 12:03:17 +1200
Hub Carpark Progress https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1266-hub-carpark-progress https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1266-hub-carpark-progress Seays continue shifting dirt around the new park area. They are working to the pegs indicating the final levels in the main area and the second area along the roadside opposite FourB.

Comp1IMG 20190730 122744

Comp2IMG 20190730 122816

]]>
Hub Car Park Development Tue, 30 Jul 2019 15:35:44 +1200
Sorting the levels at the Hub Carpark 12/07/19 https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1264-sorting-the-levels-at-the-hub-carpark-12-07-19 https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1264-sorting-the-levels-at-the-hub-carpark-12-07-19 Seay's have been busy shifting lots of pumice at The Hub to sort the levels at the new car park. Taking shape nicely.

Side note: The Otaketake extension is now at 4.2 km.

Captur1

 Capture

]]>
Hub Car Park Development Fri, 12 Jul 2019 15:50:31 +1200
Update from the Hub - Spoiler alert - Contains commercial content! https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1262-update-from-the-hub-spoiler-alert-contains-commercial-content https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1262-update-from-the-hub-spoiler-alert-contains-commercial-content Latest video from Jonny (FourB) at the hub.

]]>
Hub Car Park Development Fri, 28 Jun 2019 17:43:19 +1200
Hub Car Park June 19th. https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1261-hub-car-park-june-19th https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1261-hub-car-park-june-19th You may have wondered about the blue pipes going in. They are an upgrade of the exisitng water pipe to include a fire hydrant. This work is almost complete, so it's

time for a bigger digger!

IMG 1698

]]>
Hub Car Park Development Wed, 19 Jun 2019 08:50:32 +1200
Hub Car Park Development - Started May 2019 https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1257-hub-car-park-development-started-may-2019 https://archive.biketaupo.org.nz/index.php/projects/22-hub-car-park-development/1257-hub-car-park-development-started-may-2019 In 2018 Bike Taupō were successful in getting half a million dollars from a TIF (Tourism Infrastructure Fund) one of the few non-government groups to do so. This funding was for the development of a new mountain biking hub (the Hub) on the vacant land opposite Kefi at the Hub and FourB. Bike Taupō has a licence from TDC to occupy this area until 2028. 

This is the concept plan:

Concept 

A large part of this funding will go towards creating a carpark for trail users. There will be 51 parks in main area and a further 19 along Huka Falls Road. These parks will be longer than normal to allow loading and unloading of bikes and pedestrian access. There will also be a shelter, a bike wash facility and toilets. We will ensure that all trees currently on site are preserved. Roading and pedestrian signage will be modified to ensure everyone is safe with  the increased activity.

The carpark will link to Craters MTB Park via the tunnel under Wairakei Drive, the Cafe and Bike Hire, the Huka Trails and a soon to be constructed, shared path along Wairakei Drive to Taupō town. 

 

 

 

 

]]>
Hub Car Park Development Thu, 30 May 2019 09:56:00 +1200
Karapiti Tunnel Pipes On-site https://archive.biketaupo.org.nz/index.php/projects/23-karapiti-tunnel/1258-karapiti-tunnel-pipes-on-site https://archive.biketaupo.org.nz/index.php/projects/23-karapiti-tunnel/1258-karapiti-tunnel-pipes-on-site Everybody is familiar with the tricky road crossing from the old main car park to Hammer and Tank Stand across Karapiti Road. The good news is we are getting close to constructing a dual underpass to improve access to the northern side of the park. The pipes below have been purchased with generous funding from Lion Foundation, Grassroots, and Craters of the Moon Trust. The pipes are now on site and we are in the process of fundraising to purchase a hole to place the pipes in.

 KT1

KT2

 

]]>
Karapiti Tunnel Wed, 05 Jun 2019 14:01:20 +1200